Test Like a Visitor
Final checks should happen in the real venue, with real content and under realistic conditions. A system that works on a bench may behave differently once it is installed.
Core Checks
Work through this list with the whole team. It is based on checks we use in our installation handovers.
- Start-up and shutdown — can staff do it alone
- Full run-through — every mode and interaction
- Stress test — repeated use and fast taps
- Failure behaviour — what happens if power or network drops
- Content review — spelling, timing and brand accuracy
Getting ready to launch? We offer free consultations on testing and launch... Let's discuss your installation →
Check People and Place
Test with staff and a few unfamiliar visitors. Check cables, barriers, signage and lighting, and confirm that safety measures are in place and understood.
Sign Off Together
Agree a final sign-off with the client and note any outstanding items. Keep a record of what was tested. Agencies can request a testing plan via our partnership programme.